NO. | Equipment name | Model | Q.T.Y | Power(kw) |
1 | Buffer hopperUsage : storage material | CLX200 | 1 | 3 |
2 | Palm kernel pulverizer(Tooth roller, durable in use)
Usage : crush the palm kernel to small size to suit oil press |
SPSF56*60 | 1 | 37 |
3 | Belt conveyor
Usage : convey palm kernel to elevator |
DS100 | 1 | 1.5 |
4 | Bucket elevator
Usage : Ensure continuous materials supply, save labor and time |
DTG36/23 | 7 | 2.2*7 |
5 | Cleaning sieve
Usage : Remove imuprity in seeds |
TQLZ1500*100 | 1 | 0.5 |
6 | Specific-gravity stoner
Usage : Remove stone in seeds |
TQSF100 | 1 | 0.5 |
7 | Flaker
Usage : Make the palm kernel into thin flake go get more oil . |
60*100 | 1 | 22 |
8 | Steaming cooker
Usage : Cook the material to reach the appropriate temperature for pressing |
ZCL180*5 | 1 | 22 |
9 | Upper screw conveyor | LSS25 | 1 | 2.2 |
10 | Oil press machine
Usage : Press oil from materials, producing cake at the same time |
200A-3 | 6 | 18.5*6 |
11 | Ground screw conveyor | LSS25 | 1 | 2.2 |
12 | Cake screw conveyor
Usage : Convey the oil cake |
LSS20 | 2 | 2.2*2 |
13 | Oil residual scraper
Usage : convey oil redsidual |
LSS20 | 1 | 2.2 |
14 | Oil clarify tank
Usage:Reduce the impurities of crude oil |
CYZ200*80 | 1 | 3 |
15 | Hot oil pump | 65-50-200 | 1 | 3 |
16 | Vibration residual discharge filter
Usage : Filter the solid residuals out of crude oil |
NWB20 | 1 | |
17 | Ground oil tank
Usage : Store the filtered oil |
DYX1.5 | 1 | |
18 | Gear pump
Usage : Generate the power to filter the crude oil |
PSG25 | 1 | |
19 | Steam distribution cylinder
Usage : Distribute the gas from boiler to different pipelines |
TFQ219 | 1 | |
20 | Cyclone discharger machine | CLT/A-4-50 | 1 | |
21 | Fan | 4-72-12N04.0 | 2 | 5.5 |
22 | Cyclone deduster | XCC60 | 1 | |
23 | Air compressor | V-1.5 | 1 | 11 |
24 | Wind sealed machine | 5L | 1 | 0.75 |
25 | Wind sealed machine | 20L | 1 | 1.1 |
26 | Screw conveyor | LSS20 | 1 | 1.5 |
27 | Power distribution ( Usage : Control the power ) | 1set | ||
28 | Installation material | 1set | ||
29 | Installation and commissioning |